Country: Romania
Partner: EXIMPROD GROUP S.A.
Customer: Distributie Energie Oltenia (DEO)
Technology: PRIME
Quantity of meters: 620 000
Description of the project:
All smart meters are supplied with an integrated PLC modem and with the ability to upgrade to PRIME 1.4 in the CENELEC and FCC bands replacement of firmware, as well as with an RS-485 interface and support for a 3GPP communication module with the ability to install a modem without removal of the smart meter. Through the technical improvement of the power grid, DEO strives to increase network capacity bandwidth to connect new consumers, reduce technical and commercial energy losses, assure power quality and satisfy the growing demand from the existing consumers. This is the third project that ADD Grup delivers to DEO. The first one was deployed in 2017 and served as the basis on which was DEO formed its concept for technologies understanding and defining the strategy for the deployment of the smart meters in Romania. The results of the project are excellent evidence of the fact that DEO’s decisions were correct and well-thought. The second project delivered by ADD Grup was successfully implemented in 2020, the deployment of 10 000 smart meters.