Energa Operator was the first utility in Poland that implemented a massive rollout (Stage One) of Smart Meters, thus confirming its position as a leading investor in Polish Distribution System. This deployment took place in 2012, when Energa Operator installed 109 thousand Smart Meters delivered by ADD GRUP as a first stage of rolling out Advanced Metering Infrastructure.
On 30th of October 2013 Energa Operator officially released final results of Stage One as a success story, where collection rate for 15 minute interval data was more than 99%, and overall system performance exceeded the expectations.
Created by Five Stars Digital Agency